Skip to content
Optimus Technology Group Logo
  • Analysis: Hyperscaler Earnings Show AI Demand Outrunning Infrastructure

    Analysis: Hyperscaler Earnings Show AI Demand Outrunning Infrastructure

    Amazon, Google, and Meta join Microsoft in signaling a shift: growth is now tied to power, chips, and unprecedented capital spending.
    read more
  • Google-Anthropic Deal: AI Capacity Now Pre-Sold at Gigawatt Scale

    Google-Anthropic Deal: AI Capacity Now Pre-Sold at Gigawatt Scale

    The reported Google-Anthropic deal pairs capital with a 5 GW compute commitment, shifting how AI infrastructure is financed and allocated.
    read more
  • What Next-Gen Chips Might Mean for Data Centers

    What Next-Gen Chips Might Mean for Data Centers

    New silicon and packaging could cut power, ease cooling, and strengthen security – if software and ecosystems keep pace.
    read more
  • Salesforce is crowdsourcing its AI roadmap — with customers 

    Salesforce is crowdsourcing its AI roadmap — with customers 

    Salesforce lets its customers lead its product roadmap with the thinking that if one enterprise customer has a problem, the others likely do too.
    read more
  • Speed to Power: How Developers Are Restructuring for AI Demand

    Speed to Power: How Developers Are Restructuring for AI Demand

    Behind-the-meter data center builds, phased energization, and nuclear bets move from edge cases to core strategy.
    read more
  • Microsoft AI Surge Exposes Data Center Capacity Gap

    Microsoft AI Surge Exposes Data Center Capacity Gap

    Azure growth and a $627B backlog show AI demand outpacing power, cooling, and data center build capacity.
    read more
  • The Breaking Points: Cooling Struggles to Keep Pace With AI Power Density

    The Breaking Points: Cooling Struggles to Keep Pace With AI Power Density

    As AI workloads scale, cooling is evolving from a design consideration to a deployment challenge, forcing operators to adapt to rapidly rising power densities.
    read more
  • Elea Founder: Brazil Expansion to Accelerate After I Squared Deal

    Elea Founder: Brazil Expansion to Accelerate After I Squared Deal

    The acquisition of Elea Data Centers by I Squared Capital will fuel the Brazilian digital infrastructure operator’s expansion plans, according to the company’s founder.
    read more
  • Ferveret CEO on Cooling, Power Pains, and ‘Waterless’ Compute Gains

    Ferveret CEO on Cooling, Power Pains, and ‘Waterless’ Compute Gains

    Ferveret says fanless, waterless cooling can unlock more compute from fixed power, but deployments remain in pilot stage.
    read more
  • Oracle’s Project Jupiter Ditches Gas Turbines for Bloom Fuel Cells

    Oracle’s Project Jupiter Ditches Gas Turbines for Bloom Fuel Cells

    The Bloom Energy deal shifts planned New Mexico AI campus to on-site generation.
    read more
Previous151617Next

Phone: (512) 329-2625

Email: contactus@optimustg.com

12600 Hill Country Blvd. R275

Austin, Texas 78738

Useful Links

Optimus Techservices

Optimus Communications

Optimus Data Centers

Optimus AI

Optimus Security

Optimus Power

Privacy Policy
AccEPTABLE USE Policy
Terms of Service

Phone: (512) 329-2625

Email: contactus@optimustg.com

12600 Hill Country Blvd. R275

Austin, Texas 78738

Useful Links

Optimus Techservices

Optimus Communications

Optimus Data Centers

Optimus AI

Optimus Security

Optimus Power

Privacy Policy
Accessibility Policy
Terms of Service
Close Sliding Bar Area

AVADA IT

Fusce ut ipsum tincidunt, porta nisl sollicitudin, vulputate nunc. Cras commodo leo ac nunc convallis ets efficitur.

RECENT TWEETS

Tweets by theme_fusion

CONTACT US

  • 12345 North Main Street,
    New York, NY 555555

  • 1.800.555.6789

  • support@yoursite.com

Page load link
Go to Top